Performance Limitations for Mechanical Equipment & TER Certifications
Summary of Building Code & Research Intent The intent & provisions of the 2018 International Building Code (IBC), 2018 International Residential Code (IRC) & 2020
Summary of Building Code & Research Intent The intent & provisions of the 2018 International Building Code (IBC), 2018 International Residential Code (IRC) & 2020
Mechanical Equipment – Impact or Not Impact? Questions frequently arise as to what the rule is in Florida, Miami, and the HVHZ zone (Dade and
Wind Exposure Category Overview ASCE-7 is the governing referenced standard for design loads on buildings & other structures for building codes throughout the US. ASCE
Click Here to access our model database tool. You can filter by your AC brand, model, and number to find the TER report you need
Use this tool to search and find the applicable Technical Evaluation Report for your installation.
Want to learn how to design AC units on stands or curbs for wind design? Are you looking for tools to help in in design?
HELP PAGE For the Engineering Express® Rooftop Equipment Wind Pressure Calculator Note: See Limitations & Conditions of Use at the end of this article. Quick
From the 5th, 6th &7th Edition of the Florida Building Code (2014, 2017, 2020) section 1603.1.4 as well as from section 1603.1.4. of the 2012,
In accordance with FBC 2020 (7th Edition), the following clearance below raised roof mounted mechanical units applies inside & outside the HVHZ*: WIDTH** OF MECHANICAL
Overview Metal fastening is designed per the requirements of the American Institute of Steel Construction (AISC): Specification for Structural Steel Buildings in conjunction with the
WHEN IS A FLORIDA PRODUCT APPROVAL OR MIAMI DADE NOA REQUIRED & HOW TER’S AND PERFORMANCE EVALUATIONS FIT IN FIRST, A WORD ABOUT FLORIDA PRODUCT
FIRST, WHAT’S A CERTIFIED TER & Master Plan Sheet? TER’s or Technical Evaluation Reports and Master Plan Sheets must bear the original signature and raised
FIRST, WHAT IS A TER? TER’s or Technical Evaluation Reports are evaluations of a product’s performance. They are not intended to approve products for a
Regarding ASCE 7-16 & the 2020 Florida Building Code (FBC) Also Applies for ASCE 7-22 & 2023 Florida Building Code (8th Edition) YES. Section
Cookie | Duration | Description |
---|---|---|
cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |