Performance Limitations for Mechanical Equipment & TER Certifications
Summary of Building Code & Research Intent The intent & provisions of the 2018 International Building Code (IBC), 2018 International Residential Code (IRC) & 2020
Click this button to access Florida Product Approvals to use for your building permit.
Trane Contractors Needing Tie-Down Engineering For Permits:
> Guaranteed competitive pricing
> Fastest turn-around times
> Professional & personal services
> Value-engineered projects
> Award-winning proprietary project quoting & management software
Call or Text Engineering Express for help:
954-354-0660
Purchase certified design plans for pads, stands, and design aids to assist in your project design & permitting & connect with the product manufacturer.
Showing 1–15 of 28 results
Use these design tools for estimating important structural concepts such as wind pressure, pad & stand adaptation. Order certified results for permit.
Summary of Building Code & Research Intent The intent & provisions of the 2018 International Building Code (IBC), 2018 International Residential Code (IRC) & 2020
Mechanical Equipment – Impact or Not Impact? Questions frequently arise as to what the rule is in Florida, Miami, and the HVHZ zone (Dade and
Two common means of product evaluations in Florida are Florida Statewide Approvals (FSA’s) and Miami-Dade Notices of Acceptance (NOA’s). To help determine whether these evaluations
Click Here to access our model database tool. You can filter by your AC brand, model, and number to find the TER report you need
Use this tool to search and find the applicable Technical Evaluation Report for your installation.
F1 and F2 are the limiting performance capacities of the forces in the parallel and perpendicular directions of a building component. Which one is which
Want to learn how to design AC units on stands or curbs for wind design? Are you looking for tools to help in in design?
HELP PAGE For the Engineering Express® Rooftop Equipment Wind Pressure Calculator Note: See Limitations & Conditions of Use at the end of this article. Quick
A Frequent question is what are the span, height, pressure, and installation limitations for large & small missile impact products. The following takes into consideration
From the 5th, 6th &7th Edition of the Florida Building Code (2014, 2017, 2020) section 1603.1.4 as well as from section 1603.1.4. of the 2012,
In accordance with FBC 2020 (7th Edition), the following clearance below raised roof mounted mechanical units applies inside & outside the HVHZ*: WIDTH** OF MECHANICAL
Overview Metal fastening is designed per the requirements of the American Institute of Steel Construction (AISC): Specification for Structural Steel Buildings in conjunction with the
Engineering Express provides structural design evaluations of various types of mechanical equipment exposed to weather. There are four (4) evaluation types typically performed, each with
About Validators & Quality Assurance Compliance It is often asked of us to explain the validator and quality assurance requirements of the Florida Statewide Product
What is a Master Plan Sheet – Product Evaluation & TER? A master plan, also known as a product evaluation or TER (Technical Evaluation Report)
Here Are 3 Myths About Product Approval Requirements Background Product evaluations (sometimes called “product approvals”, “ICC reports”, NOA’s or similar) for building products are general
Product Approvals for building components are the general rule in Florida. Building officials, architects, insurance companies, even homeowners ask for them all the time, frequently
DENIED – YES OR NO? While plan reviewers, inspectors, and other building officials have the authority to question any document submitted if the document complies
WHEN IS A FLORIDA PRODUCT APPROVAL OR MIAMI DADE NOA REQUIRED & HOW TER’S AND PERFORMANCE EVALUATIONS FIT IN FIRST, A WORD ABOUT FLORIDA PRODUCT
THE BUILDING DEPARTMENT WON’T ACCEPT MY TECHNICAL EVALUATION REPORT (TER)? Sometimes, municipalities or contract documents require more information than just submitting a TER (Technical Evaluation
Cookie | Duration | Description |
---|---|---|
cookielawinfo-checkbox-analytics | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Analytics". |
cookielawinfo-checkbox-functional | 11 months | The cookie is set by GDPR cookie consent to record the user consent for the cookies in the category "Functional". |
cookielawinfo-checkbox-necessary | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookies is used to store the user consent for the cookies in the category "Necessary". |
cookielawinfo-checkbox-others | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Other. |
cookielawinfo-checkbox-performance | 11 months | This cookie is set by GDPR Cookie Consent plugin. The cookie is used to store the user consent for the cookies in the category "Performance". |
viewed_cookie_policy | 11 months | The cookie is set by the GDPR Cookie Consent plugin and is used to store whether or not user has consented to the use of cookies. It does not store any personal data. |