Sign

How To Use Master Plans – TER’s – Calculator Reports Purchased From Engineering Express

READ BELOW BEFORE USING NON SITE-SPECIFIC PERFORMANCE EVALUATIONSFROM ENGINEERING EXPRESS FOR YOUR PROJECT General Information About Non Site-Specific Plans: Certified Performance Evaluations (also referred to as Master Plans, Generic, or Non Site-Specific Plans) you receive contain a physical or digitally certified engineer seal. They are intended to be used to assist in obtaining a building …

How To Use Master Plans – TER’s – Calculator Reports Purchased From Engineering Express Read More »

Starter List In Submitting A Ground Mounted Sign For Evaluation

Signage – Ground Mounted Client Checklist   Engineering Express evaluates ground-mounted signs for structural stability.  To do this, we require a drawing detailing the structural members and connections as detailed below in order to quote and execute work. All of the information below must be provided or addressed in this drawing – an architectural detail, …

Starter List In Submitting A Ground Mounted Sign For Evaluation Read More »

Is Steel or Reinforcing or Fibermesh Required in Posts & Footings of Building Components?

INTRODUCTION The main purpose foundations serve is to distribute and resist the forces or loads experienced by the host structure due to wind, rain, snow, seismic, & other load conditions. When it comes to building components such as generators, signs, and fences the code leaves a gray area for foundation design. This happens because most …

Is Steel or Reinforcing or Fibermesh Required in Posts & Footings of Building Components? Read More »

Scroll to Top